avilasolar.com, read 4 hours ago. Back to the report
96 to 100 in 15 steps
Do them in this order. Each step says what to change, on which pages, and what it adds. Hand the whole plan to your agent, or work through it yourself.
Now #4,450 of 263,590Step 5 top 1%Step 15 full marks
Worked out from this read, with every step before it done. A score says pages are well formed. It does not say an assistant cites the site.
The steps
Each is one change across the pages named. When one is live, read the site again and mttr marks it done.
- 1
Link to orphaned pages
Under a point
Link to each of these from a related page. A page only the sitemap knows about is treated as unimportant.
Once, for the whole site
- 2
Speed up the server
Under a point
Cache pages or speed up the server. Crawlers give a slow site fewer visits.
Once, for the whole site
- 3
Link to your profiles
Under a point
Link from the home page, in its header or footer, to each profile you keep: Instagram, TikTok, YouTube, Twitch, Facebook, X, LinkedIn.
Once, for the whole site
- 4
Answer the first question right under it
Under a point
Answer the first question in the paragraph right under it, in 25 to 90 words. Whether the paragraph truly answers is for the judge or a person to say.
14 pages
See the pages
- /11-reasons-to-streamline-your-solar-plan-sets
- /5-things-to-consider-when-installing-home-solar
- /about
- /contact
- /incentives
- /muon-marketing-partnership
- /navigating-the-complexities-of-utility-scale-solar-drafting
- /portfolio
- /privacy-policy
- /services
- and 4 more in the copied plan
- 5
Put figures in tables
+1 point, to 97, and #2,055, 2,395 places up, and into the top 1%
Where the guide compares options or gives figures, put them in a table.
26 pages
See the pages
- /11-reasons-to-streamline-your-solar-plan-sets
- /2025-oregon-solar-incentives
- /5-things-to-consider-when-installing-home-solar
- /a-guide-to-large-photovoltaic-powerplant-design
- /about
- /commercial-solar-plans-a-blueprint-for-project-success
- /commercial-vs-residential-solar-design
- /contact
- /incentives
- /is-your-solar-project-designs-ready-to-submit
- and 16 more in the copied plan
- 6
Add breadcrumb data
Under a point
Add BreadcrumbList schema so the page has a place in the site.
79 pages
See the pages
- /10-ways-to-get-more-solar-leads
- /11-reasons-to-streamline-your-solar-plan-sets
- /12-factors-for-solar-project-design-success
- /2025-oregon-solar-incentives
- /5-things-to-consider-when-installing-home-solar
- /a-2025-guide-to-fast-solar-installs-for-local-installers
- /a-guide-to-large-photovoltaic-powerplant-design
- /about
- /accessibility
- /are-you-getting-the-best-solar-plan-sets
- and 69 more in the copied plan
- 7
Phrase headings as questions
+1 point, to 98
Phrase at least one heading as the question a person would ask.
20 pages
See the pages
- /11-reasons-to-streamline-your-solar-plan-sets
- /accessibility
- /contact
- /jobs
- /muon-marketing-partnership
- /navigating-the-complexities-of-utility-scale-solar-drafting
- /portfolio
- /privacy-policy
- /services
- /services/autocad-solar-design-tool
- and 10 more in the copied plan
- 8
Add depth to thin pages
Under a point
Add true, specific detail until the page covers its subject.
16 pages
See the pages
- /about
- /accessibility
- /contact
- /incentives
- /jobs
- /portfolio
- /privacy-policy
- /services
- /services/autocad-solar-design-tool
- /services/engineering-stamps
- and 6 more in the copied plan
- 9
Add structured data
Under a point
Add valid JSON-LD that says what the page is.
12 pages, 11 of them under /services/
See the pages
- /services/commercial-solar-pv-design
- /services/engineering-stamps
- /services/ev-charger-permit-designs
- /services/ground-mount-plan-sets
- /services/production-reports
- /services/residential-generator-plan-sets
- /services/solar-commissioning
- /services/solar-commissioning/quote
- /services/solar-drafting-services
- /services/solar-plan-sets
- and 2 more in the copied plan
- 10
Match structured data to the page
+1 point, to 99
Use the schema type that matches the page: Article for guides, Service or Product for offers, Organization or WebSite for the home page.
11 pages under /services/
See the pages
- /services/commercial-solar-pv-design
- /services/engineering-stamps
- /services/ev-charger-permit-designs
- /services/ground-mount-plan-sets
- /services/production-reports
- /services/residential-generator-plan-sets
- /services/solar-commissioning
- /services/solar-commissioning/quote
- /services/solar-drafting-services
- /services/solar-plan-sets
- and 1 more in the copied plan
- 11
Fix description lengths
Under a point
Write a meta description of 70 to 165 characters that summarizes the page.
14 pages
See the pages
- /a-guide-to-large-photovoltaic-powerplant-design
- /accessibility
- /contact
- /jobs
- /navigating-the-complexities-of-utility-scale-solar-drafting
- /portfolio
- /resource
- /services
- /services/solar-plan-sets
- /services/solar-plan-sets/dc
- and 4 more in the copied plan
- 12
Add lists or tables
Under a point
Add a table, a list, or a definition list. Assistants quote these more readily than prose.
8 pages
See the pages
- /accessibility
- /contact
- /incentives
- /jobs
- /privacy-policy
- /services
- /services/solar-commissioning
- /services/solar-commissioning/quote
- 13
Fix title lengths
Under a point
Write a title of 15 to 65 characters that leads with what the page covers.
8 pages
See the pages
- /11-reasons-to-streamline-your-solar-plan-sets
- /2025-oregon-solar-incentives
- /5-things-to-consider-when-installing-home-solar
- /a-guide-to-large-photovoltaic-powerplant-design
- /solar-interconnection-application
- /solar-labels-and-placards
- /ultimate-guide-to-washington-dc-solar-power
- /washington-state-solar-incentives
- 14
Link to pages from related content
Under a point
Link to this page from the text of a related page. Navigation links say a page exists; links in content say what it is related to.
7 pages
See the pages
- /accessibility
- /incentives
- /jobs
- /privacy-policy
- /services/solar-commissioning/quote
- /services/technical-solar-consultation
- /terms-conditions
- 15
Describe images
+1 point, to 100, and full marks
Describe every content image in its alt text.
7 pages, 5 of them under /services/
See the pages
- /
- /jobs
- /services/solar-drafting-services/dallas
- /services/solar-permit-design/irving
- /services/solar-permit-design/san-antonio
- /services/solar-plan-sets/austin
- /services/solar-plan-sets/oregon
3 more, to tidy up after 100
- 16
Show every FAQ question on the page
Under a point
Show every question in the FAQ schema on the page, word for word.
3 pages
See the pages
- /services/solar-drafting-services/dallas
- /services/solar-plan-sets/dallas
- /solar-ready-building-design
- 17
Put the text in the HTML
Under a point
Put the page text in the HTML the server sends. Most AI crawlers do not run scripts.
2 pages
See the pages
- /contact
- /services/solar-commissioning/quote
- 18
Bring deep pages closer to home
Under a point
Link to the page from a hub or a related page so it sits within three clicks of the home page.
1 page
See the pages
- /services/solar-permit-design
What else the read found
Half its pages take over 2,003 ms to start answering, past the 800 ms a crawler is patient with. Caching or a faster server helps every page at once. One fetch a page, the way a crawler sees it.
/resource3.7 s/solar-permitting-made-easy2.8 s/solar-interconnection-application2.8 s/whats-included-in-a-solar-plan-set2.7 s/12-factors-for-solar-project-design-success2.7 s
Fastest: /services/utility-scale-pv-system-design, 11 ms. Heaviest: /string-sizing, 52 KB.
Read from its home page’s code and the headers its server sent. A tool that loads later, or only on other pages, is not seen here.
WordPressPlatform
nginxServer
Google Tag ManagerAnalytics
Meta PixelMarketing
jQueryLibrary
Font AwesomeFonts
From the structured data on its home page, as the site says it: a Local business named Avila Solar Drafting Services. mttr does not check the profiles it names.
- Facebookavilasolarenergy
- pages with strong signs
- 2
- hidden characters
- 1
- chat, markdown or placeholders left in
- 1
- dashes per 1,000 words
- 4.7
/10-ways-to-get-more-solar-leadsplaceholders never filled in/services/utility-scale-pv-system-designhidden characters a reader cannot see
A sign is not proof. Hidden characters can carry a watermark or instructions meant for an AI, and they come off with a clean copy of the text.
/fails 1: Describe images1 page/contactfails 8: Answer the first question right under it, Put the text in the HTML and Add depth to thin pages1 page/jobsfails 7: Add depth to thin pages, Phrase headings as questions and Fix description lengths1 page/privacy-policyfails 7: Answer the first question right under it, Add depth to thin pages and Phrase headings as questions1 page/servicesfails 7: Answer the first question right under it, Add depth to thin pages and Phrase headings as questions1 page/accessibilityfails 6: Add depth to thin pages, Phrase headings as questions and Fix description lengths1 page/incentivesfails 6: Answer the first question right under it, Add depth to thin pages and Put figures in tables1 page/portfoliofails 6: Answer the first question right under it, Add depth to thin pages and Phrase headings as questions1 page/11-reasons-to-streamline-your-solar-plan-setsfails 5: Answer the first question right under it, Phrase headings as questions and Put figures in tables1 page/navigating-the-complexities-of-utility-scale-solar-draftingfails 5: Answer the first question right under it, Phrase headings as questions and Fix description lengths1 page/5-things-to-consider-when-installing-home-solarfails 4: Answer the first question right under it, Put figures in tables and Fix title lengths1 page/a-guide-to-large-photovoltaic-powerplant-designfails 4: Fix description lengths, Put figures in tables and Fix title lengths1 page
And 51 more parts of the site.
Rather go through these with one of our experts? Book a strategy session