dubakelectrical.com, read 3 days ago. Back to the report

89 to 100 in 15 steps

Do them in this order. Each step says what to change, on which pages, and what it adds. Hand the whole plan to your agent, or work through it yourself.

8989 nownow911top 10%9229339549659769779889899810991199129913991410015full marks

Now #36,914 of 263,590Step 1 top 10%Step 15 full marks

Worked out from this read, with every step before it done. A score says pages are well formed. It does not say an assistant cites the site.

The steps

Each is one change across the pages named. When one is live, read the site again and mttr marks it done.

  1. 1

    Show sources on guides

    +2 points, to 91, and #20,083, 16,831 places up, and into the top 10%

    Link the sources for the guide's facts where a reader can see them. Official and primary sources carry the most weight.

    12 pages under /post/

    See the pages
    • /post/commercial-vs-industrial-electrician-what-s-the-difference
    • /post/commercial-vs-industrial-electrician-what-s-the-difference-1
    • /post/https-www-dubakelectrical-com-post-are-low-voltage-systems-totally-safe
    • /post/https-www-dubakelectrical-com-post-importance-of-electrical-safety
    • /post/https-www-dubakelectrical-com-posts-what-are-vdfs
    • /post/industrial-electrical-safety-standards-risk-assessment-and-best-practices
    • /post/industrial-vs-residential-electricians-key-differences-roles-and-when-to-hire-each
    • /post/nfpa-70e-requirements
    • /post/post-how-to-improve-efficiency-at-a-manufacturing-facility
    • /post/what-does-an-industrial-electrician-do-understanding-their-role-in-industry
    • and 2 more in the copied plan
  2. 2

    Answer the first question right under it

    +1 point, to 92

    Answer the first question in the paragraph right under it, in 25 to 90 words. Whether the paragraph truly answers is for the judge or a person to say.

    12 pages under /post/

    See the pages
    • /post/commercial-vs-industrial-electrician-what-s-the-difference
    • /post/commercial-vs-industrial-electrician-what-s-the-difference-1
    • /post/https-www-dubakelectrical-com-post-are-low-voltage-systems-totally-safe
    • /post/https-www-dubakelectrical-com-post-importance-of-electrical-safety
    • /post/https-www-dubakelectrical-com-posts-what-are-vdfs
    • /post/industrial-electrical-safety-standards-risk-assessment-and-best-practices
    • /post/industrial-vs-residential-electricians-key-differences-roles-and-when-to-hire-each
    • /post/nfpa-70e-requirements
    • /post/post-how-to-improve-efficiency-at-a-manufacturing-facility
    • /post/what-does-an-industrial-electrician-do-understanding-their-role-in-industry
    • and 2 more in the copied plan
  3. 3

    Phrase headings as questions

    +1 point, to 93

    Phrase at least one heading as the question a person would ask.

    22 pages, 12 of them under /post/

    See the pages
    • /arcflash
    • /color-thermography
    • /control-panelsystems
    • /data
    • /heat-tracing
    • /instrumentation
    • /lighting
    • /post/commercial-vs-industrial-electrician-what-s-the-difference
    • /post/commercial-vs-industrial-electrician-what-s-the-difference-1
    • /post/https-www-dubakelectrical-com-post-are-low-voltage-systems-totally-safe
    • and 12 more in the copied plan
  4. 4

    Link straight to the final address

    +2 points, to 95

    Point links and the sitemap at the final address, not at one that redirects.

    56 pages

    See the pages
    • /about-dubak
    • /arcflash
    • /blog
    • /capabilities
    • /capability-brochures
    • /careers
    • /chicago
    • /client-partnering-program
    • /client-satisfaction
    • /color-thermography
    • and 46 more in the copied plan
  5. 5

    Fix description lengths

    +1 point, to 96

    Write a meta description of 70 to 165 characters that summarizes the page.

    28 pages

    See the pages
    • /about-dubak
    • /blog
    • /capabilities
    • /capability-brochures
    • /careers
    • /client-partnering-program
    • /client-satisfaction
    • /color-thermography
    • /company
    • /contact
    • and 18 more in the copied plan
  6. 6

    Use one main heading

    +1 point, to 97

    Give the page exactly one h1 that says what it is about.

    15 pages

    See the pages
    • /arcflash
    • /careers
    • /client-satisfaction
    • /company
    • /contact
    • /heat-tracing
    • /industrial-electrical-design
    • /instrumentation
    • /lighting
    • /modular
    • and 5 more in the copied plan
  7. 7

    Describe images

    Under a point

    Describe every content image in its alt text.

    22 pages

    See the pages
    • /
    • /about-dubak
    • /capabilities
    • /chicago
    • /client-satisfaction
    • /company
    • /electrical-contractor
    • /emergency-service
    • /indianapolis
    • /integration
    • and 12 more in the copied plan
  8. 8

    Make near-copy pages distinct

    +1 point, to 98

    Rewrite or merge pages that share most of their text. A page that only swaps a city or product name is what search engines treat as doorway or scaled content.

    Once, for the whole site

  9. 9

    Link to orphaned pages

    Under a point

    Link to each of these from a related page. A page only the sitemap knows about is treated as unimportant.

    Once, for the whole site

  10. 10

    Put figures in tables

    Under a point

    Where the guide compares options or gives figures, put them in a table.

    11 pages under /post/

    See the pages
    • /post/commercial-vs-industrial-electrician-what-s-the-difference
    • /post/commercial-vs-industrial-electrician-what-s-the-difference-1
    • /post/https-www-dubakelectrical-com-post-are-low-voltage-systems-totally-safe
    • /post/https-www-dubakelectrical-com-post-importance-of-electrical-safety
    • /post/https-www-dubakelectrical-com-posts-what-are-vdfs
    • /post/industrial-electrical-safety-standards-risk-assessment-and-best-practices
    • /post/industrial-vs-residential-electricians-key-differences-roles-and-when-to-hire-each
    • /post/nfpa-70e-requirements
    • /post/what-does-an-industrial-electrician-do-understanding-their-role-in-industry
    • /post/what-does-an-industrial-electrician-do-understanding-their-role-in-industry-1
    • and 1 more in the copied plan
  11. 11

    Add breadcrumb data

    +1 point, to 99

    Add BreadcrumbList schema so the page has a place in the site.

    31 pages

    See the pages
    • /arcflash
    • /color-thermography
    • /contract-maintenance
    • /control-panelsystems
    • /data
    • /emergency-service
    • /fiberoptics
    • /heat-tracing
    • /industrial-electrical-design
    • /industrial-hvacr-contractors
    • and 21 more in the copied plan
  12. 12

    Fix title lengths

    Under a point

    Write a title of 15 to 65 characters that leads with what the page covers.

    9 pages

    See the pages
    • /
    • /control-automation
    • /control-panelsystems
    • /electrical-contractor
    • /orlando
    • /post/industrial-electrical-safety-standards-risk-assessment-and-best-practices
    • /post/post-how-to-improve-efficiency-at-a-manufacturing-facility
    • /power
    • /virginia
  13. 13

    Link to pages from related content

    Under a point

    Link to this page from the text of a related page. Navigation links say a page exists; links in content say what it is related to.

    3 pages under /post/

    See the pages
    • /post/commercial-vs-industrial-electrician-what-s-the-difference
    • /post/what-does-an-industrial-electrician-do-understanding-their-role-in-industry
    • /post/what-does-an-industrial-electrician-do-understanding-their-role-in-industry-1
  14. 14

    Add lists or tables

    Under a point

    Add a table, a list, or a definition list. Assistants quote these more readily than prose.

    3 pages

    See the pages
    • /instrumentation
    • /post/commercial-vs-industrial-electrician-what-s-the-difference
    • /post/commercial-vs-industrial-electrician-what-s-the-difference-1
  15. 15

    Fix pages that fail to load

    +1 point, to 100, and full marks

    Fix or remove the link. Every linked page should return 200.

    2 pages

    See the pages
    • /control-automatio
    • /privacy.htm
3 more, to tidy up after 100
  1. 16

    Add structured data

    Under a point

    Add valid JSON-LD that says what the page is.

    2 pages

    See the pages
    • /blog
    • /services-5
  2. 17

    Add depth to thin pages

    Under a point

    Add true, specific detail until the page covers its subject.

    1 page

    See the pages
    • /heat-tracing
  3. 18

    Replace unsupported sales claims

    Under a point

    Replace the sales claim with a fact that can be checked.

    2 pages

    See the pages
    • /missioncritical-datacenter
    • /post/post-how-to-improve-efficiency-at-a-manufacturing-facility

What else the read found

Half its pages start answering within 37 ms, inside the 800 ms a crawler is patient with. One fetch a page, the way a crawler sees it.

  • /post/commercial-vs-industrial-electrician-what-s-the-difference-11.1 s
  • /post/industrial-vs-residential-electricians-key-differences-roles-and-when-to-hire-each221 ms
  • /post/what-is-an-industrial-electrician-and-why-are-they-essential202 ms
  • /post/what-does-an-industrial-electrician-do-understanding-their-role-in-industry-1165 ms
  • /post/post-how-to-improve-efficiency-at-a-manufacturing-facility143 ms

Fastest: /, 26 ms. Heaviest: the home page, 180 KB.

Read from its home page’s code and the headers its server sent. A tool that loads later, or only on other pages, is not seen here.

  • WixPlatform
  • ReactFramework
  • CloudflareHosting
  • FastlyHosting

From the structured data on its home page, as the site says it: an Organization named Dubak Electrical. mttr does not check the profiles it names.

  • LinkedIn1929519
  • FacebookDubakElectricalGroup
  • Instagramdubakelectricalgroup
pages with strong signs
57
hidden characters
851
chat, markdown or placeholders left in
0
dashes per 1,000 words
1.4
  • /orlando hidden characters a reader cannot see
  • /prefabrication hidden characters a reader cannot see
  • /power hidden characters a reader cannot see
  • /press-releases hidden characters a reader cannot see
  • /project-management hidden characters a reader cannot see

A sign is not proof. Hidden characters can carry a watermark or instructions meant for an AI, and they come off with a clean copy of the text.

  • / fails 2: Describe images and Fix title lengths1 page
  • /control-automatio passes every rule1 page
  • /privacy.htm passes every rule1 page
  • /control-panelsystems fails 5: Phrase headings as questions, Fix description lengths and Fix title lengths1 page
  • /heat-tracing fails 5: Add depth to thin pages, Use one main heading and Phrase headings as questions1 page
  • /instrumentation fails 5: Use one main heading, Phrase headings as questions and Add lists or tables1 page
  • /power fails 5: Phrase headings as questions, Fix description lengths and Fix title lengths1 page
  • /arcflash fails 4: Use one main heading, Phrase headings as questions and Add breadcrumb data1 page
  • /client-satisfaction fails 4: Use one main heading, Fix description lengths and Describe images1 page
  • /color-thermography fails 4: Phrase headings as questions, Fix description lengths and Add breadcrumb data1 page
  • /company fails 4: Use one main heading, Fix description lengths and Describe images1 page
  • /data fails 4: Phrase headings as questions, Fix description lengths and Add breadcrumb data1 page

And 36 more parts of the site.

Rather go through these with one of our experts? Book a strategy session

Fix dubakelectrical.com with your agent

Your agent makes the fixes. mttr checks each one. Free.

In the site’s repositorynpx skills add subinternal/mttr
Then tell your agentCheck dubakelectrical.com with mttr and fix what’s worth the most.

Claude Code, Codex, Cursor or any agent that reads AGENTS.md.

Claude Code, onceclaude mcp add --transport http mttr https://mttr.si/mcp
It needs a free key
Another agent
Read it againChanged something? A site is read at most once every ten minutes.