porter-electrical.com, read 3 days ago. Back to the report

85 to 100 in 18 steps

Do them in this order. Each step says what to change, on which pages, and what it adds. Hand the whole plan to your agent, or work through it yourself.

8585 nownow881#39,129892913top 10%9249459669679689699710971197129813981498159916991710018full marks

Now #62,960 of 263,582Step 1 #39,129Step 3 top 10%Step 18 full marks

Worked out from this read, with every step before it done. A score says pages are well formed. It does not say an assistant cites the site.

The steps

Each is one change across the pages named. When one is live, read the site again and mttr marks it done.

  1. 1

    Allow pages to be indexed

    +3 points, to 88, and #39,129, 23,831 places up

    Remove noindex when the page is ready to be found.

    29 pages

    Steps for your host: Cloudflare, WordPress, Namecheap and more
    See the pages
    • /2024/12/03
    • /2025/01/20
    • /2025/02/21
    • /2025/05/03
    • /2025/06/19
    • /2025/07/24
    • /2025/08/21
    • /2025/09/18
    • /2025/10/16
    • /2025/11/17
    • and 19 more in the copied plan
  2. 2

    Answer the first question right under it

    +1 point, to 89

    Answer the first question in the paragraph right under it, in 25 to 90 words. Whether the paragraph truly answers is for the judge or a person to say.

    24 pages

    See the pages
    • /2025-federal-tax-incentives-whats-still-available-for-homes-and-businesses
    • /2026-new-hampshire-commercial-solar-tax-credits-incentives-explained
    • /5-ways-solar-energy-can-cut-your-nh-business-utility-bills
    • /commercial-battery-storage-in-nh-why-more-businesses-are-investing-in-energy-storage
    • /commercial-solar-battery-storage-why-new-england-businesses-are-combining-both
    • /commercial-solar-installation-in-new-hampshire-a-complete-guide-for-business-owners
    • /commercial-solar-installation-timeline-in-nh-what-to-expect-from-start-to-finish
    • /commercial-solar-maintenance-monitoring-in-new-hampshire-protecting-your-investment
    • /does-commercial-solar-increase-property-value-in-new-hampshire
    • /ground-mounted-commercial-solar-systems-in-new-hampshire-when-they-make-sense
    • and 14 more in the copied plan
  3. 3

    Describe images

    +2 points, to 91, and into the top 10%

    Describe every content image in its alt text.

    63 pages

    See the pages
    • /
    • /2025-federal-tax-incentives-whats-still-available-for-homes-and-businesses
    • /2025/01/20
    • /2025/02/21
    • /2025/06/19
    • /2025/07/24
    • /2025/08/21
    • /2025/09/18
    • /2025/11/17
    • /2026-new-hampshire-commercial-solar-tax-credits-incentives-explained
    • and 53 more in the copied plan
  4. 4

    Fix description lengths

    +1 point, to 92

    Write a meta description of 70 to 165 characters that summarizes the page.

    52 pages

    See the pages
    • /2024/12/03
    • /2025/01/20
    • /2025/02/21
    • /2025/05/03
    • /2025/06/19
    • /2025/07/24
    • /2025/08/21
    • /2025/09/18
    • /2025/10/16
    • /2025/11/17
    • and 42 more in the copied plan
  5. 5

    Bring deep pages closer to home

    +2 points, to 94

    Link to the page from a hub or a related page so it sits within three clicks of the home page.

    40 pages

    See the pages
    • /2024/12/03
    • /2025-federal-tax-incentives-whats-still-available-for-homes-and-businesses
    • /2025/01/20
    • /2025/02/21
    • /2025/05/03
    • /2025/06/19
    • /2025/07/24
    • /2025/08/21
    • /2025/09/18
    • /2025/10/16
    • and 30 more in the copied plan
  6. 6

    Set each page's canonical address

    +2 points, to 96

    Add a canonical link that points to the page itself.

    25 pages, 14 of them under /2026/

    See the pages
    • /2024/12/03
    • /2025/01/20
    • /2025/02/21
    • /2025/05/03
    • /2025/06/19
    • /2025/07/24
    • /2025/08/21
    • /2025/09/18
    • /2025/10/16
    • /2025/11/17
    • and 15 more in the copied plan
  7. 7

    Link to orphaned pages

    Under a point

    Link to each of these from a related page. A page only the sitemap knows about is treated as unimportant.

    Once, for the whole site

  8. 8

    Put figures in tables

    Under a point

    Where the guide compares options or gives figures, put them in a table.

    24 pages

    See the pages
    • /2025-federal-tax-incentives-whats-still-available-for-homes-and-businesses
    • /2026-new-hampshire-commercial-solar-tax-credits-incentives-explained
    • /5-ways-solar-energy-can-cut-your-nh-business-utility-bills
    • /commercial-battery-storage-in-nh-why-more-businesses-are-investing-in-energy-storage
    • /commercial-solar-battery-storage-why-new-england-businesses-are-combining-both
    • /commercial-solar-installation-in-new-hampshire-a-complete-guide-for-business-owners
    • /commercial-solar-installation-timeline-in-nh-what-to-expect-from-start-to-finish
    • /commercial-solar-maintenance-monitoring-in-new-hampshire-protecting-your-investment
    • /does-commercial-solar-increase-property-value-in-new-hampshire
    • /ground-mounted-commercial-solar-systems-in-new-hampshire-when-they-make-sense
    • and 14 more in the copied plan
  9. 9

    List your profiles in your structured data

    Under a point

    Add sameAs to the Organization, Person or LocalBusiness on your home page, listing the address of each profile: Instagram, TikTok, YouTube, Twitch, Facebook, X, LinkedIn. It is how assistants tie your site to you elsewhere.

    Once, for the whole site

  10. 10

    Show sources on guides

    +1 point, to 97

    Link the sources for the guide's facts where a reader can see them. Official and primary sources carry the most weight.

    6 pages

    See the pages
    • /commercial-solar-maintenance-monitoring-in-new-hampshire-protecting-your-investment
    • /power-your-summer-lifestyle-how-solar-supports-pools-evs-and-more
    • /racing-the-deadline-what-the-senate-bill-means-for-your-residential-solar-installation
    • /understanding-energy-management
    • /why-now-is-the-best-time-for-commercial-solar-installation-in-nh
    • /why-winter-is-still-a-great-time-for-solar-panel-installation
  11. 11

    Add an llms.txt

    Under a point

    Add /llms.txt: a short plain text map of the site for assistants. Its effect is unproven, so treat it as cheap insurance.

    Once, for the whole site

  12. 12

    Phrase headings as questions

    Under a point

    Phrase at least one heading as the question a person would ask.

    6 pages

    See the pages
    • /2026-new-hampshire-commercial-solar-tax-credits-incentives-explained
    • /industrial-solar-power-systems-for-manufacturing-facilities-in-new-hampshire
    • /power-your-summer-lifestyle-how-solar-supports-pools-evs-and-more
    • /powering-community-with-purpose-first-parish-church-solar-installation-in-newbury-ma
    • /why-now-is-the-best-time-for-commercial-solar-installation-in-nh
    • /why-summer-is-the-best-time-to-invest-in-residential-solar-installation
  13. 13

    Use one main heading

    +1 point, to 98

    Give the page exactly one h1 that says what it is about.

    17 pages

    See the pages
    • /2026-new-hampshire-commercial-solar-tax-credits-incentives-explained
    • /5-ways-solar-energy-can-cut-your-nh-business-utility-bills
    • /commercial-battery-storage-in-nh-why-more-businesses-are-investing-in-energy-storage
    • /commercial-solar-battery-storage-why-new-england-businesses-are-combining-both
    • /commercial-solar-installation-timeline-in-nh-what-to-expect-from-start-to-finish
    • /does-commercial-solar-increase-property-value-in-new-hampshire
    • /ground-mounted-commercial-solar-systems-in-new-hampshire-when-they-make-sense
    • /how-commercial-battery-storage-can-help-reduce-peak-demand-charges
    • /how-new-hampshire-businesses-reduce-demand-charges-with-commercial-solar
    • /industrial-solar-power-systems-for-manufacturing-facilities-in-new-hampshire
    • and 7 more in the copied plan
  14. 14

    Show when guides were updated

    Under a point

    Show when the guide was last updated, and set dateModified in its schema.

    4 pages

    See the pages
    • /2026-new-hampshire-commercial-solar-tax-credits-incentives-explained
    • /understanding-energy-management
    • /why-now-is-the-best-time-for-commercial-solar-installation-in-nh
    • /why-winter-is-still-a-great-time-for-solar-panel-installation
  15. 15

    Set a share image

    Under a point

    Set og:image so links to the page carry a picture.

    44 pages

    See the pages
    • /2024/12/03
    • /2025/01/20
    • /2025/02/21
    • /2025/05/03
    • /2025/06/19
    • /2025/07/24
    • /2025/08/21
    • /2025/09/18
    • /2025/10/16
    • /2025/11/17
    • and 34 more in the copied plan
  16. 16

    Link straight to the final address

    +1 point, to 99

    Point links and the sitemap at the final address, not at one that redirects.

    28 pages

    See the pages
    • /2024/12/03
    • /2025/01/20
    • /2025/02/21
    • /2025/05/03
    • /2025/06/19
    • /2025/07/24
    • /2025/08/21
    • /2025/09/18
    • /2025/10/16
    • /2025/11/17
    • and 18 more in the copied plan
  17. 17

    Add depth to thin pages

    Under a point

    Add true, specific detail until the page covers its subject.

    2 pages

    See the pages
    • /porter-electrical-named-a-2025-energysage-installer-of-the-year
    • /why-now-is-the-best-time-for-commercial-solar-installation-in-nh
  18. 18

    Replace unsupported sales claims

    +1 point, to 100, and full marks

    Replace the sales claim with a fact that can be checked.

    10 pages

    See the pages
    • /commercial-solar-barrington-public-library-barrington-nh
    • /commercial-solar-first-parish-church-newbury-ma
    • /commercial-solar-installation
    • /commercial-solar-installation-candia-nh
    • /commercial-solar-installation-chichester-nh
    • /commercial-solar-installation-dover-nh
    • /commercial-solar-installation-raymond-nh
    • /commercial-solar-towneplace-suites-by-marriott-manchester-nh
    • /commercial-solar-waterline-industries-seabrook-nh
    • /residential-solar-installation
2 more, to tidy up after 100
  1. 19

    Fix title lengths

    Under a point

    Write a title of 15 to 65 characters that leads with what the page covers.

    7 pages

    See the pages
    • /author/porterelectricalcontracting
    • /author/porterelectricalcontracting/page/2
    • /author/porterelectricalcontracting/page/3
    • /ev-charging-station-installation
    • /industrial-solar-power-systems-for-manufacturing-facilities-in-new-hampshire
    • /power-your-summer-lifestyle-how-solar-supports-pools-evs-and-more
    • /racing-the-deadline-what-the-senate-bill-means-for-your-residential-solar-installation
  2. 20

    Fix pages that fail to load

    Under a point

    Fix or remove the link. Every linked page should return 200.

    1 page

    See the pages
    • /battery-system-installation

What else the read found

Half its pages start answering within 53 ms, inside the 800 ms a crawler is patient with. One fetch a page, the way a crawler sees it.

  • /2026/09/092.2 s
  • /commercial-solar-towneplace-suites-by-marriott-manchester-nh2.2 s
  • /why-summer-is-the-best-time-to-invest-in-residential-solar-installation2.1 s
  • /solarize-deerfield2.0 s
  • /5-ways-solar-energy-can-cut-your-nh-business-utility-bills1.7 s

Fastest: /commercial-solar-for-schools, 17 ms. Heaviest: /cart, 61 KB.

Read from its home page’s code and the headers its server sent. A tool that loads later, or only on other pages, is not seen here.

  • WordPressPlatform
  • GoDaddy Website BuilderPlatform
  • CloudflareHosting
  • Google AnalyticsAnalytics
  • jQueryLibrary
  • BootstrapLibrary

From the structured data on its home page, as the site says it: an Organization named Porter Electrical Contracting. mttr does not check the profiles it names.

pages with strong signs
3
hidden characters
4
chat, markdown or placeholders left in
0
dashes per 1,000 words
1.5
  • /our-services hidden characters a reader cannot see
  • /ev-charging-station-installation hidden characters a reader cannot see
  • /generator-installation hidden characters a reader cannot see

A sign is not proof. Hidden characters can carry a watermark or instructions meant for an AI, and they come off with a clean copy of the text.

  • / fails 1: Describe images1 page
  • /battery-system-installation passes every rule1 page
  • /why-now-is-the-best-time-for-commercial-solar-installation-in-nh fails 8: Answer the first question right under it, Show sources on guides and Show when guides were updated1 page
  • /2026-new-hampshire-commercial-solar-tax-credits-incentives-explained fails 7: Answer the first question right under it, Show when guides were updated and Use one main heading1 page
  • /industrial-solar-power-systems-for-manufacturing-facilities-in-new-hampshire fails 7: Answer the first question right under it, Use one main heading and Phrase headings as questions1 page
  • /porter-electrical-named-a-2025-energysage-installer-of-the-year fails 7: Answer the first question right under it, Add depth to thin pages and Use one main heading1 page
  • /power-your-summer-lifestyle-how-solar-supports-pools-evs-and-more fails 7: Answer the first question right under it, Show sources on guides and Phrase headings as questions1 page
  • /why-summer-is-the-best-time-to-invest-in-residential-solar-installation fails 7: Answer the first question right under it, Use one main heading and Phrase headings as questions1 page
  • /5-ways-solar-energy-can-cut-your-nh-business-utility-bills fails 6: Answer the first question right under it, Use one main heading and Fix description lengths1 page
  • /racing-the-deadline-what-the-senate-bill-means-for-your-residential-solar-installation fails 6: Answer the first question right under it, Show sources on guides and Put figures in tables1 page
  • /the-battery-storage-providers-we-trust fails 6: Answer the first question right under it, Use one main heading and Fix description lengths1 page
  • /understanding-energy-management fails 6: Answer the first question right under it, Show sources on guides and Show when guides were updated1 page

And 61 more parts of the site.

Rather go through these with one of our experts? Book a strategy session

Fix porter-electrical.com with your agent

Your agent makes the fixes. mttr checks each one. Free.

In the site’s repositorynpx skills add subinternal/mttr
Then tell your agentCheck porter-electrical.com with mttr and fix what’s worth the most.

Claude Code, Codex, Cursor or any agent that reads AGENTS.md.

Claude Code, onceclaude mcp add --transport http mttr https://mttr.si/mcp
It needs a free key
Another agent
Read it againChanged something? A site is read at most once every ten minutes.