tlcelectrical.com, read 1 day ago. Back to the report
94 to 100 in 11 steps
Do them in this order. Each step says what to change, on which pages, and what it adds. Hand the whole plan to your agent, or work through it yourself.
Now #10,626 of 263,889Step 1 #4,967Step 3 top 1%Step 11 full marks
Worked out from this read, with every step before it done. A score says pages are well formed. It does not say an assistant cites the site.
The steps
Each is one change across the pages named. When one is live, read the site again and mttr marks it done.
- 1
Describe images
+1 point, to 95, and #4,967, 5,659 places up
Describe every content image in its alt text.
49 pages
See the pages
- /
- /argyle-commercial-electrician
- /argyle-electrical-contractors
- /arlington-commercial-electrician
- /arlington-electrical-contractors
- /bartonville-commercial-electrician
- /bartonville-electrical-contractors
- /bartonville-electrician
- /carrollton-commercial-electrician
- /carrollton-electrical-contractors
- and 39 more in the copied plan
- 2
Fix description lengths
+1 point, to 96
Write a meta description of 70 to 165 characters that summarizes the page.
43 pages
See the pages
- /argyle-commercial-electrician
- /argyle-electrical-contractors
- /arlington-commercial-electrician
- /arlington-electrical-contractors
- /bartonville-commercial-electrician
- /bartonville-electrical-contractors
- /bartonville-electrician
- /carrollton-commercial-electrician
- /carrollton-electrical-contractors
- /carrollton-electrician
- and 33 more in the copied plan
- 3
Fix title lengths
+1 point, to 97, and into the top 1%
Write a title of 15 to 65 characters that leads with what the page covers.
29 pages
See the pages
- /
- /argyle-commercial-electrician
- /arlington-commercial-electrician
- /bartonville-commercial-electrician
- /bartonville-electrical-contractors
- /bartonville-electrician
- /benefits-of-switching-to-led-lighting
- /blog
- /carrollton-commercial-electrician
- /carrollton-electrical-contractors
- and 19 more in the copied plan
- 4
Make near-copy pages distinct
+1 point, to 98
Rewrite or merge pages that share most of their text. A page that only swaps a city or product name is what search engines treat as doorway or scaled content.
Once, for the whole site
- 5
Show when guides were updated
Under a point
Show when the guide was last updated, and set dateModified in its schema.
8 pages
See the pages
- /chandelier-installation-high-ceiling-dfw-homes
- /commercial-electrical-maintenance-checklist
- /electrical-safety-inspection-older-dfw-home
- /electrical-troubleshooting-flickering-lights
- /hot-outlet-warning-signs
- /pool-pump-electrical-problems
- /tesla-charger-installation-near-me-dfw-prep
- /whole-home-generator-vs-portable-generator
- 6
Speed up the server
Under a point
Cache pages or speed up the server. Crawlers give a slow site fewer visits.
Once, for the whole site
- 7
List your profiles in your structured data
Under a point
Add sameAs to the Organization, Person or LocalBusiness on your home page, listing the address of each profile: Instagram, TikTok, YouTube, Twitch, Facebook, X, LinkedIn. It is how assistants tie your site to you elsewhere.
Once, for the whole site
- 8
Name the publisher
+1 point, to 99
Name the author or publisher in the Article schema.
8 pages
See the pages
- /chandelier-installation-high-ceiling-dfw-homes
- /commercial-electrical-maintenance-checklist
- /electrical-safety-inspection-older-dfw-home
- /electrical-troubleshooting-flickering-lights
- /hot-outlet-warning-signs
- /pool-pump-electrical-problems
- /tesla-charger-installation-near-me-dfw-prep
- /whole-home-generator-vs-portable-generator
- 9
Phrase headings as questions
Under a point
Phrase at least one heading as the question a person would ask.
7 pages
See the pages
- /argyle-commercial-electrician
- /argyle-electrical-contractors
- /arlington-commercial-electrician
- /lewisville-electrical-contractors
- /northlake-commercial-electrician
- /roanoke-electrical-contractors
- /saginaw-electrical-contractors
- 10
Add breadcrumb data
Under a point
Add BreadcrumbList schema so the page has a place in the site.
15 pages
See the pages
- /chandelier-installation-high-ceiling-dfw-homes
- /commercial-electrical-maintenance-checklist
- /electrical-safety-inspection-older-dfw-home
- /electrical-troubleshooting-flickering-lights
- /generac-installer-in-dfw-questions
- /hot-outlet-warning-signs
- /led-pool-lights-vs-traditional-pool-lights-dfw
- /lewisville-electrical-contractors
- /northlake-commercial-electrician
- /pool-bonding-safety-guide-dfw
- and 5 more in the copied plan
- 11
Bring deep pages closer to home
+1 point, to 100, and full marks
Link to the page from a hub or a related page so it sits within three clicks of the home page.
10 pages
See the pages
- /breaker-box-replacement-guide
- /chandelier-installation
- /cost-to-upgrade-electrical-panel
- /dedicated-electrical-circuits
- /electrical-safety-inspection-older-dfw-home
- /electrical-troubleshooting-flickering-lights
- /homeowner-electrical-education
- /how-much-to-replace-breaker-box
- /what-to-know-before-upgrading-your-electrical-panel-in-your-dfw-home
- /when-to-replace-electrical-panel
3 more, to tidy up after 100
- 12
Use one main heading
Under a point
Give the page exactly one h1 that says what it is about.
5 pages
See the pages
- /
- /electrical-panel-upgrade-signs-before-summer
- /home-ev-charger-installation-checklist-dfw
- /telc41017
- /thank-you
- 13
Show every FAQ question on the page
Under a point
Show every question in the FAQ schema on the page, word for word.
4 pages
See the pages
- /argyle-commercial-electrician
- /argyle-electrical-contractors
- /arlington-commercial-electrician
- /keller-electrical-contractors
- 14
Replace unsupported sales claims
Under a point
Replace the sales claim with a fact that can be checked.
1 page
See the pages
- /standby-generator-guide
What else the read found
Half its pages take over 2,030 ms to start answering, past the 800 ms a crawler is patient with. Caching or a faster server helps every page at once. One fetch a page, the way a crawler sees it.
/electrical-safety-inspection-older-dfw-home4.7 s/lewisville-electrical-contractors4.0 s/irving-commercial-electrician3.6 s/blog3.6 s/fort-worth-electrician3.5 s
Fastest: /cost-to-upgrade-electrical-panel, 33 ms. Heaviest: /50-amp-generator-guide, 56 KB.
Read from its home page’s code and the headers its server sent. A tool that loads later, or only on other pages, is not seen here.
WordPressPlatform
nginxServer
Google Tag ManagerAnalytics
- GGoogle AnalyticsAnalytics
jQueryLibrary
Google FontsFonts
Font AwesomeFonts
From the structured data on its home page, as the site says it: an Organization named TLC Electrical. mttr does not check the profiles it names.
- pages with strong signs
- 0
- hidden characters
- 0
- chat, markdown or placeholders left in
- 0
- dashes per 1,000 words
- 1.2
A sign is not proof. Hidden characters can carry a watermark or instructions meant for an AI, and they come off with a clean copy of the text.
/fails 3: Use one main heading, Describe images and Fix title lengths1 page/argyle-commercial-electricianfails 5: Show every FAQ question on the page, Phrase headings as questions and Fix description lengths1 page/arlington-commercial-electricianfails 5: Show every FAQ question on the page, Phrase headings as questions and Fix description lengths1 page/lewisville-electrical-contractorsfails 5: Phrase headings as questions, Fix description lengths and Describe images1 page/argyle-electrical-contractorsfails 4: Show every FAQ question on the page, Phrase headings as questions and Fix description lengths1 page/electrical-safety-inspection-older-dfw-homefails 4: Show when guides were updated, Name the publisher and Bring deep pages closer to home1 page/electrical-troubleshooting-flickering-lightsfails 4: Show when guides were updated, Name the publisher and Bring deep pages closer to home1 page/keller-electrical-contractorsfails 4: Show every FAQ question on the page, Fix description lengths and Describe images1 page/northlake-commercial-electricianfails 4: Phrase headings as questions, Fix description lengths and Describe images1 page/roanoke-electrical-contractorsfails 4: Phrase headings as questions, Fix description lengths and Describe images1 page/saginaw-electrical-contractorsfails 4: Phrase headings as questions, Fix description lengths and Describe images1 page/bartonville-commercial-electricianfails 3: Fix description lengths, Describe images and Fix title lengths1 page
And 88 more parts of the site.
The read stopped at its page limit, so pages no link leads to cannot be told from pages it did not reach, and neither is reported.
Rather go through these with one of our experts? Book a strategy session