Agent View
The site as an AI agent gets it, beside the site as a person sees it. What it can read, what it has to cut away, and what it never sees.
How it worksCheck availability Coverage by state and…Permit guides Practical advice for your…Permit directory Browse local permit inf…Common questions Answers to permit quest…PricingCheck Permit Requirements
On this page
⌃
Home
/
Blog
/
Can I Build an ADU in Madison, WI?
Zoning
The rest of the page is in full screen.
On this page 1. 2. 3. 4. 5. [Zoning](https://govcodex.com/blog/category/zoning) # Can I Build an ADU in Madison, WI? Madison allows attached and detached ADUs, but you need site plan approval, permits, licensed contractors, address assignment, and impact-fee review. GovCodex Team3 min readUpdated July 13, 2026  madisonwisconsinADUaccessory dwelling unitsite plan approval **Direct Answer:** Yes, Madison allows accessory dwelling units, but you cannot skip review. The City says you need permits to build any ADU, and you must first obtain site plan approval. Detached and attached ADUs have their own Development Services Center pages, and both point applicants to zoning review, Building Inspection permits, licensed contractors, address assignment, and Parks impact-fee review. *Verified against official municipal and state sources: July 13, 2026. Requirements change — confirm with the city before applying.* ## Key Takeaways - Madison's detached ADU page says you need a permit to build any ADU and need site plan approval first ([New Detached Accessory Dwelling Unit](https://www.cityofmadison.com/development-services-center/1-2-family-residential/new-building-construction/new-detached-accessory)). - Madison's attached ADU page says attached ADUs are a permitted use on the lot and can be up to 1,000 square feet of living area ([Attached Accessory Dwelling Unit](https://www.cityofmadison.com/development-services-center/1-2-family-residential/additions/attached-accessory-dwelling-unit)). - The principal building may have up to eight units under the City's published ADU guidance. - Engineering assigns a new address for the ADU. - You must pay a Parks impact fee for a new ADU; Madison's page says to check with Parks for the current rate. - Licensed contractors are needed to obtain permits and complete the work. --- ## Attached vs. Detached ADU An attached ADU is built inside or attached to an existing principal building. Madison's guidance says attached ADUs may occupy any area inside the building, including a full basement, and may be up to 1,000 square feet of living area. A detached ADU is a separate structure, such as a backyard cottage or converted accessory building, and triggers site placement, utility, and address questions. The practical sequence is the same: confirm zoning, prepare a site plan, obtain site plan approval, get the right permits, use licensed contractors, and schedule inspections. If you are converting a garage or basement, the building-code questions — egress, fire separation, ceiling height, heating, plumbing, and electrical — can be more important than the zoning question. ## What to Prepare - A site plan showing the existing house, proposed ADU, parking, lot lines, and setbacks. - Existing floor plans if converting interior space. - Proposed floor plans, elevations, and construction details. - Utility information and any new address requirements. - Contractor information for building, plumbing, electrical, and HVAC work. For broader conversion issues, see [Can I Turn My Garage Into an Apartment?](https://govcodex.com/blog/can-i-convert-my-garage-into-an-apartment-adu). ## FAQ **Are ADUs a permitted use in Madison?** Madison's attached ADU page says ADUs are a permitted use on the lot, but you still need site plan approval and permits. **Can a Madison ADU be in a basement?** Yes, Madison's attached ADU guidance says ADUs may occupy any area inside the building, including a full basement. **Can I pull every permit myself?** Not generally. Madison says licensed contractors are needed to obtain permits and complete the work. ## Verify Your Address Use [GovCodex's Madison permit catalog](https://govcodex.com/wisconsin/madison) or [run a permit check](https://govcodex.com/permit-check) before design work so the ADU answer is tied to your parcel and project type. [Check this project for your property](https://govcodex.com/permit-check?source=blog&content=can-i-build-an-adu-in-madison-wi) [Browse the permit directory](https://govcodex.com/permits) ## Related Articles [ Permits Can I Build an ADU in Aurora, IL? Aurora, IL has no published ADU ordinance — its own occupancy rules say single-family lots may not have apartments added. Here's what to confirm with the city before you plan a coach house or garage apartment. July 13, 20268 min read](https://govcodex.com/blog/can-i-build-an-adu-in-aurora-il) [ Permits Can I Build an ADU (Coach House) in Evanston? Evanston allows detached coach houses, garage conversions, and interior ADUs on any residential lot as a permitted use — no owner-occupancy or extra parking required, but zoning, historic-district, and permit review still apply. July 13, 20267 min read](https://govcodex.com/blog/can-i-build-an-adu-in-evanston) [ Permits Can I Build an ADU in Green Bay? Yes — as of a December 2025 zoning amendment, Green Bay allows one accessory dwelling unit per lot in every residential district with a conditional use permit, subject to size, parking, and owner-occupancy rules. July 13, 20268 min read](https://govcodex.com/blog/can-i-build-an-adu-in-green-bay) [← All posts](https://govcodex.com/blog)
An agent gets this page whole: its own text is in the HTML the server sends.
The figures
100 pages, set against the 167,893 sites with figures.
- Readablehigher is better
- 100%100 of 100 pages
- All 167,893 sitesBetter than 47%
Pages whose own text is in the HTML the server sends, enough of it for their kind.
- Cleanhigher is better
- 95%middle page
- All 167,893 sitesBetter than 94%
Of the words before script, the share that are the page and not menus, footer and forms.
- Costshown, never scored
- 326,788tokens
- About 3,268 a page
To read every page once. A long page that answers well is not worse for it. Tokens are estimated at about 4 characters each.
How its pages spread on Clean
100 pages measured.
Against its rivals
The sites nearest it by what they do, with figures. Close means similar work, not better.
| Readinghigher is better | Costnot scored | ||
|---|---|---|---|
| Site | Readable | Clean | Tokens a page |
| govcodex.comThis site, 100 pages | 100% | 95% | 3,268 |
| permitnotebook.com100 pages | 100% | 90% | 4,723 |
| siteplancreator.com100 pages | 99% | None | 2,218 |
First of 3 on Readable, first on Clean.
AI crawler access
What robots.txt says to each, as read on October 23, 2026. 8 of 8 may read the site.
| Crawler | robots.txt says | Used for | The line that decides |
|---|---|---|---|
| GPTBotOpenAI | Not named | Training models | Falls to User-agent: * |
| OAI-SearchBotOpenAI | Not named | ChatGPT search | Falls to User-agent: * |
| ChatGPT-UserOpenAI | Not named | A page a person asks about | Falls to User-agent: * |
| ClaudeBotAnthropic | Not named | Training models | Falls to User-agent: * |
| Claude-SearchBotAnthropic | Not named | Claude’s search | Falls to User-agent: * |
| PerplexityBotPerplexity | Not named | Perplexity search | Falls to User-agent: * |
| Google-ExtendedGoogle | Not named | Training Gemini | Falls to User-agent: * |
| bingbotMicrosoft | Not named | Bing and Copilot | Falls to User-agent: * |
Every AI crawler mttr checks may read it. Not named means the rules for every crawler apply.
Every page
Worst first. Each opens in Agent View at the top.
No page loses anything an agent needs.Open the action plan
| What an agent getshigher is better | Signals | Costnot scored | ||||
|---|---|---|---|---|---|---|
| Page | Words | Clean | Readable | Main heading | Tokens | What it loses |
| /status | 33 | 24% | Yes | Yes | 100 | Nothing |
| /permit-check | 198 | 43% | Yes | Yes | 341 | Nothing |
| /contact | 108 | 50% | Yes | Yes | 229 | Nothing |
| /sla | 95 | 54% | Yes | Yes | 188 | Nothing |
| /cookie-policy | 136 | 63% | Yes | Yes | 265 | Nothing |
| /support | 260 | 77% | Yes | Yes | 466 | Nothing |
| /states | 360 | 81% | Yes | Yes | 730 | Nothing |
| /features | 401 | 83% | Yes | Yes | 853 | Nothing |
| /privacy | 391 | 83% | Yes | Yes | 699 | Nothing |
| /pricing | 495 | 86% | Yes | Yes | 1,015 | Nothing |
| /acp | 513 | 86% | Yes | Yes | 1,077 | Nothing |
| /blog | 641 | 87% | Yes | Yes | 1,708 | Nothing |
| /blog/locations | 660 | 87% | Yes | Yes | 1,645 | Nothing |
| /about | 522 | 88% | Yes | Yes | 854 | Nothing |
| /blog/do-i-need-a-permit-to-finish-my-basement | 672 | 88% | Yes | Yes | 1,710 | Nothing |
| /permits | 563 | 88% | Yes | Yes | 1,496 | Nothing |
| /answers | 609 | 89% | Yes | Yes | 1,247 | Nothing |
| /blog/can-i-build-an-adu-in-minneapolis | 652 | 89% | Yes | Yes | 1,478 | Nothing |
| /blog/do-i-need-a-permit-for-a-deck-in-madison-wi | 733 | 89% | Yes | Yes | 1,526 | Nothing |
| /blog/can-i-build-an-adu-in-chicago | 697 | 89% | Yes | Yes | 1,612 | Nothing |
| /blog/do-i-need-a-permit-for-a-deck-in-chicago | 753 | 89% | Yes | Yes | 1,697 | Nothing |
| /blog/can-i-build-an-adu-in-madison-wi | 715 | 90% | Yes | Yes | 1,481 | Nothing |
| /blog/do-i-need-a-permit-for-a-fence-in-madison-wi | 804 | 90% | Yes | Yes | 1,643 | Nothing |
| /blog/accela-alternative | 811 | 91% | Yes | Yes | 1,805 | Nothing |
| /blog/do-i-need-a-permit-for-a-deck-in-minneapolis | 846 | 91% | Yes | Yes | 1,821 | Nothing |
Show where it stands
A card, a badge and a line, each with the figures.

A badge for the site
<a href="https://mttr.si/agent-view/govcodex.com"><img src="https://mttr.si/agent-view/govcodex.com/badge.svg" alt="Agent View: 100% readable, 95% clean" height="20"></a>
The figures in one line
govcodex.com in Agent View: 100% of pages readable, better than 47% of sites; 95% clean; 326,788 tokens to read all 100 pages. mttr.si/agent-view/govcodex.com
What to do next
Fix the pages, let an agent do it, and read the site again to see the figures move.
Fix what agents miss
No page loses anything an agent needs. The action plan has the site’s other fixes.
Open the action planConnect your agent
Claude Code, Codex or Cursor reads the site’s fixes over MCP, fixes a page in your code, has mttr read it again, and checks the fix landed.
https://mttr.si/mcpSet up an agent
Claim the site
Prove it is yours with a DNS record or a file. Your agent can then reach its reads and jobs, and set each change to wait for your approval.
Claim the siteDrawn from the HTML mttr fetched on its read of October 23, 2026, not a screenshot, and only from the 100 pages read, where the read stopped at its page limit. An assistant’s own reader may differ. Tokens are estimated at about 4 characters each. A site an agent reads well is not a site an assistant cites.