Agent View
The site as an AI agent gets it, beside the site as a person sees it. What it can read, what it has to cut away, and what it never sees.
How it worksCheck availability Coverage by state and…Permit guides Practical advice for your…Permit directory Browse local permit inf…Common questions Answers to permit quest…PricingCheck Permit Requirements
On this page
⌃
Home
/
Blog
/
Do I Need a Permit for a Deck in Minneapolis?
Permits
The rest of the page is in full screen.
On this page 1. 2. 3. 4. 5. [Permits](https://govcodex.com/blog/category/permits) # Do I Need a Permit for a Deck in Minneapolis? Minneapolis deck projects usually need a permit, with a narrow exception for low freestanding decks that are not attached to frost footings and do not serve the main entrance. GovCodex Team3 min readUpdated July 13, 2026  minneapolisminnesotadeck permitMinnesota State Building Codezoning **Direct Answer:** Usually yes. Minneapolis's current deck handout states the trigger as exactly three conditions: “A building permit is required when the deck or platform is more than 30 inches above grade; attached to the main structure; or part of an accessible route” ([Decks at single-family and two-family dwellings](https://www.minneapolismn.gov/media/-www-content-assets/documents/Wood-Deck-Guidelines.pdf), Construction Code Services, Last Updated 06/2025). The narrow exception is a freestanding deck that is less than 30 inches high, is not attached to a structure with frost footings, and does not serve the main entrance to the dwelling. Even then, zoning rules for size and location still apply. *Verified against official municipal and state sources: July 13, 2026. Requirements change — confirm with the city before applying.* ## Key Takeaways - Minneapolis's deck page links to City wood-deck guidelines and Minnesota Department of Labor and Industry residential deck fact sheets ([Decks](https://www.minneapolismn.gov/business-services/licenses-permits-inspections/construction-permits/building-requirements/decks/)). - The City's deck permit PDF says deck projects require a permit, even when replacing an old deck with one of the same size ([Decks and Building Permits PDF](https://www2.minneapolismn.gov/media/content-assets/www2-documents/departments/Decks-and-Building-Permits-for-One-and-Two-Family-Dwellings.pdf)). - Minneapolis's exempt-work page gives the low-deck exception: freestanding, less than 30 inches high, not attached to a structure with frost footings, and not serving the main entrance ([Construction work exempt from permit](https://www.minneapolismn.gov/business-services/licenses-permits-inspections/construction-permits/exempt-from-permit/)). - Zoning still reviews size and location; the deck PDF tells applicants to contact zoning for setbacks before preparing plans. - Minneapolis enforces the Minnesota State Building Code locally, so state deck rules and City zoning both matter. --- ## Permit or Exempt? The key question is not just height. A low platform can still require review if it is attached, supported by frost footings, or functions as the main entrance landing. A higher deck, attached deck, deck with stairs/guards, or replacement of structural framing should be treated as permit-required. Minneapolis also expects a site plan. The City's deck PDF describes a site plan as a representation of the property showing property lines, house, garage, and where the deck will be built. It also warns that the fence is not the property line and suggests contacting zoning for setbacks before preparing plans. ## What to Prepare - Site plan with property lines, house, garage, deck location, and distances. - Deck drawings showing posts, beams, joists, stairs, guards, and footings. - Height above grade. - Whether it is freestanding or attached. - Whether it serves a required entrance. For broader code context, see [Do I Need a Permit to Build a Deck?](https://govcodex.com/blog/do-i-need-a-permit-to-build-a-deck) and [Deck Footings, Frost Depth, and Code Requirements Explained](https://govcodex.com/blog/deck-footings-frost-depth-code-requirements). ## FAQ **Can I rebuild the same deck without a permit?** Apply the same three conditions to what you are rebuilding — the City's current deck handout states no separate rule for a rebuild, so a replacement deck that is more than 30 inches above grade, attached to the house, or part of an accessible route needs a permit exactly as a new one would. Minnesota's rule does exempt “ordinary repairs to structures,” but it excludes work that opens or removes a wall, cuts a structural beam or load-bearing support, or changes a required means of egress (Minn. R. 1300.0120 subp. 6), which a tear-down-and-rebuild will usually reach. Ask Minneapolis Development Review ([email protected], 311 or 612-673-3000) before assuming a rebuild is exempt. **Are low decks exempt?** Only if they meet every condition: freestanding, under 30 inches, not attached to frost-footing structures, and not serving the main entrance. **Does zoning still matter if no building permit is required?** Yes. Minneapolis still requires zoning compliance for size and location. ## Verify Your Address Check [GovCodex's Minneapolis permit catalog](https://govcodex.com/minnesota/minneapolis) or [run a permit check](https://govcodex.com/permit-check) before you draw plans, especially if your lot is narrow, corner, sloped, or near water. [Check this project for your property](https://govcodex.com/permit-check?source=blog&content=do-i-need-a-permit-for-a-deck-in-minneapolis) [Browse the permit directory](https://govcodex.com/permits) ## Related Articles [ Permits Do You Need a Permit to Pour Concrete? Patios, Slabs & Walkways Pouring concrete may be permit-exempt or regulated depending on whether it is a patio, slab, walkway, driveway, structural base, or right-of-way work. August 14, 202610 min read](https://govcodex.com/blog/do-i-need-a-permit-for-a-concrete-patio-or-walkway) [ Permits Do You Need a Permit for an EV Charger? Learn when a home EV charger needs an electrical permit, when panel or service upgrades enter the project, and how inspection and utility coordination work. August 9, 20267 min read](https://govcodex.com/blog/do-i-need-a-permit-for-an-ev-charger) [ Permits Do You Need a Permit for a Kitchen Remodel? Learn when cabinets, sinks, islands, appliances, walls, wiring, plumbing, gas, or ventilation can change kitchen-remodel permit and inspection needs. August 6, 202610 min read](https://govcodex.com/blog/do-i-need-a-permit-for-a-kitchen-remodel) [← All posts](https://govcodex.com/blog)
An agent gets this page whole: its own text is in the HTML the server sends.
The figures
100 pages, set against the 167,893 sites with figures.
- Readablehigher is better
- 100%100 of 100 pages
- All 167,893 sitesBetter than 47%
Pages whose own text is in the HTML the server sends, enough of it for their kind.
- Cleanhigher is better
- 95%middle page
- All 167,893 sitesBetter than 94%
Of the words before script, the share that are the page and not menus, footer and forms.
- Costshown, never scored
- 326,788tokens
- About 3,268 a page
To read every page once. A long page that answers well is not worse for it. Tokens are estimated at about 4 characters each.
How its pages spread on Clean
100 pages measured.
Against its rivals
The sites nearest it by what they do, with figures. Close means similar work, not better.
| Readinghigher is better | Costnot scored | ||
|---|---|---|---|
| Site | Readable | Clean | Tokens a page |
| govcodex.comThis site, 100 pages | 100% | 95% | 3,268 |
| permitnotebook.com100 pages | 100% | 90% | 4,723 |
| siteplancreator.com100 pages | 99% | None | 2,218 |
First of 3 on Readable, first on Clean.
AI crawler access
What robots.txt says to each, as read on October 23, 2026. 8 of 8 may read the site.
| Crawler | robots.txt says | Used for | The line that decides |
|---|---|---|---|
| GPTBotOpenAI | Not named | Training models | Falls to User-agent: * |
| OAI-SearchBotOpenAI | Not named | ChatGPT search | Falls to User-agent: * |
| ChatGPT-UserOpenAI | Not named | A page a person asks about | Falls to User-agent: * |
| ClaudeBotAnthropic | Not named | Training models | Falls to User-agent: * |
| Claude-SearchBotAnthropic | Not named | Claude’s search | Falls to User-agent: * |
| PerplexityBotPerplexity | Not named | Perplexity search | Falls to User-agent: * |
| Google-ExtendedGoogle | Not named | Training Gemini | Falls to User-agent: * |
| bingbotMicrosoft | Not named | Bing and Copilot | Falls to User-agent: * |
Every AI crawler mttr checks may read it. Not named means the rules for every crawler apply.
Every page
Worst first. Each opens in Agent View at the top.
No page loses anything an agent needs.Open the action plan
| What an agent getshigher is better | Signals | Costnot scored | ||||
|---|---|---|---|---|---|---|
| Page | Words | Clean | Readable | Main heading | Tokens | What it loses |
| /status | 33 | 24% | Yes | Yes | 100 | Nothing |
| /permit-check | 198 | 43% | Yes | Yes | 341 | Nothing |
| /contact | 108 | 50% | Yes | Yes | 229 | Nothing |
| /sla | 95 | 54% | Yes | Yes | 188 | Nothing |
| /cookie-policy | 136 | 63% | Yes | Yes | 265 | Nothing |
| /support | 260 | 77% | Yes | Yes | 466 | Nothing |
| /states | 360 | 81% | Yes | Yes | 730 | Nothing |
| /features | 401 | 83% | Yes | Yes | 853 | Nothing |
| /privacy | 391 | 83% | Yes | Yes | 699 | Nothing |
| /pricing | 495 | 86% | Yes | Yes | 1,015 | Nothing |
| /acp | 513 | 86% | Yes | Yes | 1,077 | Nothing |
| /blog | 641 | 87% | Yes | Yes | 1,708 | Nothing |
| /blog/locations | 660 | 87% | Yes | Yes | 1,645 | Nothing |
| /about | 522 | 88% | Yes | Yes | 854 | Nothing |
| /blog/do-i-need-a-permit-to-finish-my-basement | 672 | 88% | Yes | Yes | 1,710 | Nothing |
| /permits | 563 | 88% | Yes | Yes | 1,496 | Nothing |
| /answers | 609 | 89% | Yes | Yes | 1,247 | Nothing |
| /blog/can-i-build-an-adu-in-minneapolis | 652 | 89% | Yes | Yes | 1,478 | Nothing |
| /blog/do-i-need-a-permit-for-a-deck-in-madison-wi | 733 | 89% | Yes | Yes | 1,526 | Nothing |
| /blog/can-i-build-an-adu-in-chicago | 697 | 89% | Yes | Yes | 1,612 | Nothing |
| /blog/do-i-need-a-permit-for-a-deck-in-chicago | 753 | 89% | Yes | Yes | 1,697 | Nothing |
| /blog/can-i-build-an-adu-in-madison-wi | 715 | 90% | Yes | Yes | 1,481 | Nothing |
| /blog/do-i-need-a-permit-for-a-fence-in-madison-wi | 804 | 90% | Yes | Yes | 1,643 | Nothing |
| /blog/accela-alternative | 811 | 91% | Yes | Yes | 1,805 | Nothing |
| /blog/do-i-need-a-permit-for-a-deck-in-minneapolis | 846 | 91% | Yes | Yes | 1,821 | Nothing |
Show where it stands
A card, a badge and a line, each with the figures.

A badge for the site
<a href="https://mttr.si/agent-view/govcodex.com"><img src="https://mttr.si/agent-view/govcodex.com/badge.svg" alt="Agent View: 100% readable, 95% clean" height="20"></a>
The figures in one line
govcodex.com in Agent View: 100% of pages readable, better than 47% of sites; 95% clean; 326,788 tokens to read all 100 pages. mttr.si/agent-view/govcodex.com
What to do next
Fix the pages, let an agent do it, and read the site again to see the figures move.
Fix what agents miss
No page loses anything an agent needs. The action plan has the site’s other fixes.
Open the action planConnect your agent
Claude Code, Codex or Cursor reads the site’s fixes over MCP, fixes a page in your code, has mttr read it again, and checks the fix landed.
https://mttr.si/mcpSet up an agent
Claim the site
Prove it is yours with a DNS record or a file. Your agent can then reach its reads and jobs, and set each change to wait for your approval.
Claim the siteDrawn from the HTML mttr fetched on its read of October 23, 2026, not a screenshot, and only from the 100 pages read, where the read stopped at its page limit. An assistant’s own reader may differ. Tokens are estimated at about 4 characters each. A site an agent reads well is not a site an assistant cites.